Project: North East Waste Water Treatment Plant, North-Eastern Pennsylvania, several tanks with different geometries, including one with two radii

Contractor: E.E. Austin & Son

MEVA Systems: Leight-weight wall formwork MevaLite

Formwork Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
4
 

Project

86’ Diameter Radius with Ease

Construction Company E.E. Austin & Son chose MevaLite for the challenging task of forming several tanks with different geometries, including one with 2 radii. 

Project Manger Mike Dolph states: “We are used to using Steel-ply forms. MevaLite’s flexibility eliminated using multiple formwork systems for the difficult structure. MevaLite has less ties. Uses a lot less hardware. The forms are light. “I hope I never see another Symons panel in my life.” 

The project began in late 2009 and took 1 year to complete. It took 5 pours to form the large round tank. Past experience working with MEVA salesman Pat Coughenour and the efficiency of using MevaLite made the decision for Project Manager Mike Dolph very easy.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.