PROJECT DATA

Majestic Setting amid Palm-Dotted Gardens and Fountains in Fujairah City

Project: 2nd Largest Mosque in UAE - size of 3 football pitches and hold over 13,000 people in its prayer hall

Designer and Architect:  Arkitek ICB SDN. BHD & Trend Capital Consulting J.V.

Contractor: United Engineering Construction UNEC LLC 

MEVA Systems: Wall formwork Mammut 350, slab formwork MevaDec, Load Tower LT 50

Formwork Engineering: MEVA KHK, Dubai, UAE

 
 
1
2
3
4
 

Project

Sheik Zayed Mosque to be 2nd Largest

Majestic Setting amid Palm-Dotted Gardens and Fountains in Fujairah City

Fujairah’s new mosque will be the second largest in the UAE when completed in July 2012. Set amid palm-dotted gardens and fountains in Fujairah city, the mosque will be the size of 3 football pitches and hold over 13,000 people in its prayer hall. The exterior is made of stone, the interior of marble and granite. The formwork solutions for foundations, beams, cores, walls, slabs and columns were designed and provided by MEVA KHK from its Dubai offices.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.