PROJECT DATA

Rough River Spillway Extension: Tough Schedule and Tough Conditions.

Project: Rough river spillway in Louisville, Kentucky

Contractor: Hall Contracting, Kentucky

MEVA Systems: Imperial Wall Formwork, Support frame STB 450

Formwork Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
3
 

Project

No Time for Plywood Formwork Facing Decay

Joe Willis at WhiteCap Louisville knows: call MEVA for every concrete project with a tough schedule. As in
this case with WhiteCap client Hall Contracting of Kentucky. The heavy-duty Imperial wall system helped get the job done on time and within budget. On the Rough River Dam Spillway Improvements project the Imperial and the MEVA STB single-sided formwork were used to form the 26 ft tall baffle walls, the 16 ft tall single-sided walls as well as various other head and channel walls. Tough site and weather conditions made working difficult. Luckily, there was no plywood with rotting problems, since MEVA uses 100% wood-free facing.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.