PROJECT DATA

Two 20 /25 level residential towers, The International Quarter, Stratford near London

Contractor: Byrne Bros. Ltd.

Developer: Lend Lease LCR

MEVA Systems: Automatic climbing system MAC, Wall formwork Mammut 350, Wall formwork AluStar

Formwork engineering: MEVA Formwork Systems Tamworth, Haiterbach and Singapore

 
 
1
2
3
4
5
 

Project

Byrne Brothers using MEVA‘s Automatic Climbing System MAC on another Landmark Project in London

Speed, Safety and Quality Concrete Pours: Rising High in Stratford

As part of the Olympic Legacy Byrne Bros. are adding to their impressive portfolio of high rise concrete structures with the construction of two residential towers in Stratford. They form part of the International Quarter development on Londons’s eastern perimeter.

The developers claim the International Quarter will be an inspiring business and living environment with 4 million ft² of workspace, 330 new homes, a major 4 star design hotel, shops, restaurants, childcare and community facilities. The residential options include campus style houses and high rise towers with spectacular views of the City skyline.

It is on these two 20 and 25 level residential towers that contractor Byrne Bros. is using the automatic hydraulic climbing system MAC. This MEVA high-rise technology, its safety housing and wide working platforms won the job on account of its safety, efficiency and quality advantages.

One of them is that the hydraulic lift pushes off concrete that has already set, a big advantage in safety and speed. The climbing pockets are on the inside of the core. This enhances the quality of the concrete finish – a requirement increasingly stipulated by many architects. The lift is very easy to operate with only a small team.

Accuracy and speed of operation with suspended shutters

Mammut 350 wall panels are used as suspended shutters. Their all-plastic facing delivers a superb concrete finish throughout the building process. There is little effort in adjusting the shutters in 3 directions and tight tolerances for accuracy. No special tools are needed.

Hand-set AluStar for columns

In addition to the MAC, Byrne Bros. chose to use the AluStar system for the storey-high columns. The AluStar wall panels are moved by hand and allow for unrestricted, fast concrete pours.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.