Project: Springfield Regional Medical Centre, OH
Contractor: Danis Building Construction Miamisburg, OH
MEVA Systems: Wall formwork Imperial and MevaLite
Specifications: Springfield Regional Medical Centre had been in the planning stage for 10 years, and the $235 million facility was under construction for 2 years. The hospital is 475,000 ft² and accommodates for 254 private rooms. Danis Building Construction chose to use MEVA Imperial panels for the 20’ tall walls. After getting such great production numbers with Imperial they decided to bring in MevaLite for the Dock walls and shorter walls, instead of using their Symons fleet. There were 20 plus pours on this project.
Engineering: MEVA Formwork Systems, Springfield, OH
Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction
MEVA fulfils stringent requirements with flexible formwork solutions. The Budapest Zoo & Botanical Garden is one of the Hungary’s most popular cultural attractions.
MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.
BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.
MEVA Formwork Systems, Inc.
2000 Airpark Drive
Springfield, Ohio 45502
United States of America