Project: Renovation/Extension of Hôpital Cochin clinic, Paris. With 2-level parking lot, 4 levels with room heights over 4 m, pour cyles of 300 m²

Contractor: SICRA île de France, Groupe Vinci

MEVA systems: Slab formwork MevaDec, Shoring tower MEP

Formwork Engineering: MEVA Formwork Systems, France

 
 
1
2
3
4
 

Project

MevaDec: No Fixed Grid

Flexible in handling irregular slab layouts without a single right angle

Urban construction sites often battle with confined space and congested delivery access. This was the case when the Hôpital Cochin clinic in Paris was rebuilt and extended. 42.000 m² of slabs had to be poured on 5 levels and within a tight time schedule. What’s more, the site had to master irregular and constantly changing slab layouts without a single right angle.

This added up to a Formula 1 challenge for the MevaDec system. It is the only system that does not follow a rigid grid. The panels can change direction flexibly and compensation areas thus be reduced to below 20 cm. Site-built filler areas are thus minimised, saving time and labour. Forming around the large numbers of columns made this benefit very apparent. Using identical parts, the workers simply left out a panel and slid in secondary beams around the columns, on which they laid out wooden facing to fill the small compensation area.

The site also relied on MEVA’s shoring system MEP to achieve slab heights beyond 4 m and support the many concrete beams.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.