PROJECT DATA

Bönisch office and storage complex with cantilevering, trapezoid slabs

Project: Office and storage complex with cantilevering, trapezoid slabs for Bönisch Ges. mbH, Gramastetten, Austria 

Contractor: Schmid Hochbau GmbH, Frankenburg, Austria

MEVA Systems:  Slab formwork system MevaDec, Slab formwork MevaFlex, Shoring tower MEP

Formwork Engineering: MEVA Schalungs- Systeme, Pfaffstätten, Austria

 
 
1
2
3
 

Project

Bönisch office and storage complex with cantilevering, trapezoid slabs

Fast & Flexible: MevaDec

Home heating specialist Bönisch in Gramastetten, Austria is building a new office and storage complex with a trapezoid layout. Contractor Schmid used the MevaDec and MevaFlex slab systems and MEP shoring towers for the trapezoid slabs, 30 cm thick and 260 m² large, part of which cantilever.

MevaDec: fewer filler areas
The MevaDec‘s drop-head, beam and panel method, used on this site, allows the panels and beams to be stripped early, saving inventory and speeding up workflow. More importantly, there is no fixed layout, so the forming direction can alternate – a big plus when adjusting to irregular layouts. This minimized costly compensation areas.

MevaFlex on MEP shoring towers for cantilevering slabs at 12 m
The biggest challenge was forming the cantilevering roof slab at heights of 9 to 12 m, for which the MevaFlex forms rested on high MEP shoring towers. 

No subsequent costs
Contractor Schmid wisely opted for the rental insurance scheme RentalPlus, which covers all subsequent costs that are incurred at the end of a rental project, for instance for repairs and re-facing. A small fee covers all these costs, reducing rental time and costs. Calculation is clear from the start.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.