PROJECT DATA

17,400 m² tower with 35 apartments on 36 levels.

Project: Condominium tower with 35 appartments on 36 levels with 17,400 m2 living area

Developer: SC Global

Contractor: Dragages Singapore, a subsidiary of Bouygues Construction

MEVA Systems: automatic climbing System MAC

Formwork Engineering: MEVA Formwork Systems, Singapore

 
 
1
2
3
4
5
 

Project

Fair-Faced Climbing: The new condominium tower Admore Park

Dragages Singapore, a subsidiary of Bouygues Construction, is building the new condominium tower Ardmore Park in Singapore for developer SC Global. The tower is climbing with MEVA’s automatic hydraulic climbing system MAC. Designed by architect Carlos Zapata and located in Ardmore Park, the 17,400 m² tower will comprise 35 apartments on 36 levels.

The architects stipulated an architectural concrete finish for the core walls because the walls are exposed on some floors. Since the MAC system does not use anchors on the external face of the core walls but pockets on the internal face, the finish is superior to all other external climbing systems.
This is why contractor Dragages chose to use the MAC.

The facade itself comprises a curtain wall with a sophisticated system of directional sun screens intended to regulate light and heat according to the position of the sun. The project subscribes to the principle of sustainable construction, and will be granted Green Mark (1) certification by the Singapore authorities.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.