PROJECT DATA

Development in the Heart of London

Project: Three 8-storey residential blocks with 74 apartments being built on the Chelsea Barracks site in central London

Architects: Squire & Partners, London

Contractor: Byrne Bros. Ltd.

MEVA Systems: Automatic climbing system MAC, AluStar wall formwork panels equipped with the all-plastic facing alkus

Engineering and support: MEVA Formwork Systems Singapore and Tamworth, UK

 

PROJECT

Chelsea Barracks: MAC climbing system and AluStar wall formwork on schedule

Chelsea Barracks were built in the 1860s in the area between Sloane Square and the Thames to house two battalions of troops. In the 1960s, the original Victorian buildings were replaced by two 13-storey concrete tower blocks. These were demolished to make way for new residential plans some years ago. After being sold, the area is now being developed. Three 8-storey towers with 74 apartments are being built on the site.

Contractor Byrne Bros. Ltd. once again chose the MAC automatic hydraulic system to climb the shafts. Project management is adhering to a tight, ambitious time schedule for concrete works and relies on the system’s proven advantages in terms of safety, efficiency, speed and quality. On the MAC platform, which is completely enclosed, AluStar panels are being used as hanging shutters. They are set up, moved and adjusted entirely by hand.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    Biogen biopharmaceutical production plant in Luterbach near Solothurn, Switzerland

    High, Fast, Safe: A state-of-the-art biopharmaceutical production plant is being built for the US biotechnology company Biogen, located on the grounds of a former paper factory in Luter bach near Solothurn, Switzerland.

  • Floating High Over Deep Ground

    Floating High Over Deep Ground

    One of the latest thrills: Float like a bird at a skydiving center, where an artificial airstream will keep you up in the air.

  • Saving 4 Weeks on Schedule

    Saving 4 Weeks on Schedule

    The solution: table forms, 5.40 m long to exactly fit into the openings between the columns. Short filler pieces with rounded edges provided a perfect match to the column layout.