PROJECT DATA

Modular formwork carriage on new German high-speed railway line

Project: Tunnel entries on the Nuremberg-Berlin ICE high-speed railway line

Developer: Deutsche Bahn AG (German railways)

Contractor (and Architects): Wayss&Freytag, Bilfinger Berger, Max Bögl, Marti Tunnelbau AG and Marti Deutschland GmbH. All of them located in Germany.

MEVA Systems: modular formwork carriage

Formwork Engineering: MEVA Schalungs-Systeme GmbH, Munich branch

 
 
1
2
 

Project

4 ½ Weeks of Assembly Time Saved

Modular formwork carriage on new German high-speed railway line

The new high-speed railway line requires some 25 tunnels on its way from Nuremberg to Berlin. The entries of several tunnels were poured using a modular formwork solution that MEVA designed and built for fast and multiple use in the mountainous terrain. 

Thanks to its modular construction, the formwork carriage was fast to set up, disassemble and adapt to varying needs. It took no more than a low platform trailer to transport it from one tunnel to the next. The modular, mobile construction had 2 rolled-steel joists, with steel profiles crossways on the top. The lateral formwork parts were foldable. The entire tunnel formwork construction was placed on lowering wedges and equipped with wheels for easy movement. Pouring was done through filling nozzles.

Easy and fast transport saving much time, work and money
The modules were delivered ready to use and were quick to assemble on the construction site and disassemble for transport to the next site. Being less than 3 metres wide and only 12,60 metres long, they fit on a low platform trailer without problems. Transport and assembly work was so fast that one and a half weeks were saved for the three tunnel entries that were poured after the first one, a saving of almost 4.5 weeks. Two contractors involved in building railway tunnels 100 km further south were so impressed by the time-saving solution and easy transport, they ordered the MEVA carriage for their own sites. Thus, the cleverly engineered solution helped 4 additional tunnel projects to move along faster and more cost-effectively. Only the lateral parts of the formwork carriage had to be adapted to the differently sized tunnel entries. 

No plywood but all-plastic facing
Once the plywood had been used for 7 months, it was spent. In order to deliver a good concrete surface for the following projects, 6 mm alkus sheets were laid onto the plywood and screwed on. They have an unlimited lifespan, can be bent to various forms and deliver a superior concrete finish with every pour. 

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.